| Introduction |
"GF-4" |
October |
|
|
|
| A-1 |
Introduction/Category Drivers |
October |
|
|
|
| A-2 |
Introduction/Category Drivers |
October |
|
|
|
| A-3 |
Introduction/Category Drivers |
October |
|
|
|
| A-4 |
Recent Vehicle Trends |
October |
|
|
|
| A-5 |
Recent Vehicle Trends |
October |
|
|
|
| A-6 |
Federal Regulation Details |
October |
|
|
|
| A-7 |
Federal Regulation Details |
October |
|
|
|
| A-8 |
Engine Tests Proposed for
GF-4 |
October |
|
|
|
| A-9 |
Engine Tests Proposed for GF-4 |
October |
|
|
|
| A-10 |
Engine Tests Proposed for GF-4 |
October |
|
|
|
| A-11 |
Original GF-4 Timing Proposal |
October |
|
|
|
| A-12 |
ILSAC GF-4 Timeline (2000) |
January |
|
|
|
| A-12A |
ILSAC GF-4 Timeline (2002) |
|
|
December |
|
| A-13-25 |
ILSAC GF-4 What, Why, When and How? |
|
|
December |
|
| B-1 |
Introduction |
October |
|
|
|
| B-2 |
ILSAC Proposal |
October |
|
|
|
| B-3 |
ACC Proposal |
October |
|
|
|
| B-4 |
API Proposal |
December |
|
|
|
| B-4A |
API Proposal (cont.) |
|
|
December |
|
| B-5 - B-7 |
Appendix A - ILSAC Proposal |
October |
|
|
|
| B-8 - B-44 |
Appendix B - ACC Proposal |
October |
|
|
|
| B-31 |
Appendix B - ACC Proposal |
|
|
December |
|
| B-32 |
Appendix B - ACC Proposal |
|
|
December |
|
| B-35 |
Appendix B - ACC Proposal |
|
|
December |
|
| B-37 |
Appendix B - ACC Proposal |
|
|
December |
|
| B-45 - B-49 |
Appendix C - API Proposal |
October |
|
|
|
| B-50 |
Appendix D - ILSAC Proposal |
December |
|
|
|
| B-51 |
ILSAC GF-4 Needs Statement |
|
April |
|
|
| B-52 |
Working Draft GF-4 Needs Statement |
|
June |
|
|
| B-53 |
GF-4 Needs Statement |
|
|
January |
|
| C-1 |
Introduction |
|
|
December |
|
| C-2 |
OEM Input - New Engine Oil Category |
October |
|
|
|
| C-3 |
Proposed Tests |
October |
|
|
|
| C-4 - C-6 |
ILSAC Draft Specification for
GF-4 |
October |
|
|
|
| C-6-1 - C-6-2 |
Modification of Preamble as of October
23, 2003 |
|
|
December |
|
| C-7 - C-11 |
ILSAC Draft Specification for GF-4 |
October |
|
|
|
| C-12 |
Timing of Category Development |
|
December |
|
|
| D-1 |
Introduction |
October |
|
December |
|
| D-2 |
Proposed Performance Tests |
October |
December |
|
|
| D-3 |
Sequence IIIG |
|
|
January |
|
| D-4 |
Sequence IIIG |
|
December |
|
|
| D-4A |
Sequence IIIG (cont.) |
|
June |
|
|
| D-4A1 |
Sequence IIIG (cont.) |
|
December |
January |
|
| D-4A2 |
Sequence IIIG (cont.) |
|
|
April |
|
| D-4A3 |
Sequence IIIG (cont.) |
|
|
April |
|
| D-4A4 |
Sequence IIIG (cont.) |
|
|
April |
|
| D-4A5 - D-4A8 |
Sequence IIIG (cont.) |
|
|
July |
|
| D-4E |
Sequence IIIG Development Data |
|
August |
|
|
| D-4E1 |
Sequence IIIG Final Proposed Test
Procedure |
|
December |
|
|
| D-4E2 |
Sequence IIIG Final Proposed Test
Procedure |
|
|
April |
|
| D-4E3 |
Sequence IIIG Final Proposed Test
Procedure |
|
|
April |
|
| D-4B - D4G |
Sequence IIIG Development |
|
|
July |
|
| D-5 |
Sequence VIB (Modified) |
|
December |
|
|
| D-5A |
Sequence VIB (Modified) |
|
April |
|
|
| D-5A1 |
Sequence VIB (Modified) |
|
December |
|
|
| D-5B - D-5N |
Sequence VI Development Initial
Design of Experiment |
|
April |
|
|
| D-6 |
Sequence VIB |
October |
|
|
|
| D-7 |
OPEST |
|
June |
|
|
| D-8 |
OPEST |
|
June |
|
|
| D-8A |
OPEST |
|
April |
|
|
| D-9 |
BRT (ASTM D 6557) |
October |
|
|
|
| D-10 |
Sequence VG |
October |
|
|
|
| D-11 |
Sequence IVA |
October |
|
|
|
| D-12 |
Sequence VIII |
October |
|
|
|
| D-13 |
MHT-4 TEOST |
October |
|
|
|
| E-1A |
American Society for Testing and
Materials (ASTM) |
|
December |
|
|
| E-1B |
American Society for Testing and
Materials (ASTM) |
|
|
April |
|
| E-1B-1 |
American Society for Testing and
Materials (ASTM) |
|
|
April |
|
| E-1C |
ASTM PCEOCP Matrix Oil Selection
Work Group |
|
|
July |
|
| E-1D - E-1O |
Matrix Oil Selection Work Group
Report |
|
|
April |
|
| E-3 |
ILSAC/Oil (cont.) |
|
August |
|
|
| E-3A |
ILSAC/Oil (cont.) |
|
August |
|
|
| E-3B |
ILSAC/Oil (cont.) |
|
August |
|
|
| E-4 |
Brainstorming |
|
June |
|
|
| E-5 |
ILSAC/Oil (cont.) |
|
August |
|
|
| E-6 |
ILSAC/Oil (cont.) |
|
December |
January |
|
| E-7 |
ILSAC/Oil (cont.) |
|
|
April |
|
| E-7A |
ILSAC/Oil (cont.) |
|
|
May |
|
| E-7B |
ILSAC/Oil (cont.) |
|
|
May |
|
| E-7C |
ILSAC/Oil (cont.) |
|
|
July |
|
| E-7D |
ILSAC/Oil (cont.) |
|
|
July |
|
| E-7E |
ILSAC/Oil (cont.) |
|
|
December |
|
| E-8 |
ILSAC/Oil (cont.) |
|
|
April |
|
| E-8A-E-8G |
ILSAC/Oil Committee Mark-Up of June 2001 ILSAC
Draft GF-4 |
|
|
July |
|
| F-1 |
ASTM Matrix Design Task Force
(MDTF) |
|
December |
|
|
| F-2 |
ASTM Matrix Design Task Force
(MDTF) (cont.) |
|
December |
|
|
| F-3 |
ASTM Matrix Design Task Force (MDTF) (cont.) |
|
|
December |
|
| |
|
|
|
|
|
| H-1 |
Introduction |
October |
|
|
|
| H-2 |
Glossary |
October |
|
|
|
| H-3 |
Glossary |
October |
|
|
|